
Artemis 91
Managed by Periurja




Secured Generation is enabled for this project. Learn More
About the Project
Artemis•91 is our fourth project in collaboration with PeriUrja. Located in Navi Mumbai, this plant is installed on the rooftops of Silver Star, this plant uses mono crystalline PERC modules from Premier Energies and is connected to MSEDCL power grid.
Every unit (kWh) from this project discounts ₹5.50 off your power bill
Overview
Capacity
91.56 KW
Reservation Status
87% Reserved
Operational Validity
Nov 2040
Annualised Savings
11.5%
Timeline
Host IdentificationSep 2024
Host signs up for power via PeriUrja.
Project CommissioningMay 2025
Project installed and commissioned on host premise.
View Project DetailsIntegrated with SundayGridsNov 2025
Project opened up for Digital Solar access
Learn about Operator-Managed ProjectsProject Open for ReservationNov 2025
This digital solar project is open for reserving capacity.
View Service ContractProject Reports
Get generation reports and other details of the project into your mailbox.
Add project to watchlist for updates
Know more about Projects
Why do factors such as tenure or
credit rate differ between projects?
Do I need to be in the same location as the project to reserve from it?
How much solar can I reserve?
How long can I reserve solar for?
What is the validity of my credits?
Are my monthly credits constant?
